E-Mail:pvcsheetpile@smallboss.com
US

Small Boss Vinyl Sheet Pile New Project is ongoing

2022-12-07

Small Boss new vinyl sheet pile project is ongoing for errosion control of the river bank, with total length 2.5km.

 

Project water stop cofferdam
Project location Somewhere in Zhejiang, China
Use model U718
Total project length 2.5Km